Xero guide · Feature 47 · Pro

How to add section subtotals to a Xero invoice

Give customers a clear breakdown of labour, materials or each phase of a job. RachelsTools adds a labelled subtotal below the lines it covers.

Make long invoices easier to read

  • Group related charges

    Show customers what they’re paying for in each section, from labour and materials to separate phases of a job.

  • Put subtotals in context

    Show each subtotal right below the item lines it covers, with wording that makes sense for your invoice.

  • Refresh the amounts after edits

    Preview the recalculated subtotals together after changing quantities or prices.

Watch how to add a subtotal in Xero

Add the blank subtotal line at 0:21, apply the subtotal at 0:39 and refresh it after edits at 1:23. You’ll need RachelsTools Pro in Google Chrome.

  1. Add a blank line below the section

    In an editable Xero invoice, group the related item lines together. Insert a blank line immediately below them and leave the item, quantity and price fields empty.

    Click the blank line, then select Section subtotal in the RachelsTools line toolbar. If the button is hidden, enable Section subtotal helper in RachelsTools’ Xero transaction settings.

    Example invoice lines
    DescriptionLine amount
    Cable£60.00
    Fittings£30.00
    Blank line for the materials subtotal
  2. Choose a label and apply the subtotal

    Pick Labour, Materials or Other, or enter your own label with Custom wording. By default, the helper totals the lines above the blank row back to the last subtotal or the top of the invoice. Adjust the first and last lines if needed.

    Check the preview and select Apply. The subtotal appears in the Description field. Xero still calculates the invoice total from your item lines.

    Xero invoice with the RachelsTools Section subtotal button and separate description-only subtotals for Training and Balls
    Each section ends with its own subtotal in the Description column.
  3. Recalculate after changing an item line

    To check the subtotals before saving, select an existing subtotal and open Section subtotal again. Review the old and recalculated amounts, then select Apply all subtotal updates.

    If you edit the description yourself, keep Subtotal: at the start and the amount at the end so RachelsTools can find and update the line.

    After changing the cable price
    LineBeforeAfter
    Cable£60.00£80.00
    Fittings£30.00£30.00
    Materials subtotal£90.00£110.00